Collect existing records, not new risky observations
Give the provider the address, property type, who can authorize the visit, known location of the access opening, existing size or inspection information and photographs already available. Add known previous liner/equipment work, dates and constraints on access or attendance. Mark missing measurements and conditions as unknown.
You do not need to enter the crawl space, lift or remove material, operate equipment or investigate a suspected fault to ask for an assessment. Ask the provider how it will obtain missing information. This page is not an entry, hazard-assessment or preparation-work procedure.
Get the visit and its boundaries accepted
Ask the receiving business to confirm the actual address, job size, access conditions and the role coming to assess it. Record the appointment, expected assessment scope, any investigation excluded, the written deliverable and charges if no installation is purchased. An advertised service area is different from acceptance of this request.
Ask what happens if the expected access is unavailable or conditions prevent the agreed assessment. The provider must state any additional attendance, investigation or other-trade proposal before it is treated as approved.
Name preparation, removal and disposal in the proposal
| Record | What to clarify |
|---|---|
| Old cover and material | Is removal partial or complete? Who removes, handles and disposes of it, and which material is outside the accepted scope? |
| Area and obstructions | Who assesses the actual work area and any constraints? No customer preparation task or access clearance is assumed here. |
| Insulation or other work | Is it included, a separate option or another trade’s responsibility? Ask what findings justify it. |
| Equipment-related tasks | If equipment is proposed, who accepts any related power, discharge, access and service arrangements? |
| Attendance and changes | How many stages or visits are proposed, who attends each, and how will new findings or repeat attendance be priced and approved? |
A multi-stage proposal does not establish a fixed number of visits or a completion date. Provider-advertised duration is not an accepted schedule for your property.
Keep assessment and installation permission separate
Receiving a quote, booking an assessment and approving installation are different decisions. Confirm who may authorize additional work and how a changed scope and price will be recorded. Preserve a declined or deferred proposal alongside any actual assessment payment.
Next, compare what the proposed scope contains and the total and payment terms. Confirm any appointment directly with the named business.
